Heat Number

Heat Number is an identification coupon number that is stamped on a metal plate after it is removed from the ladle and rolled at a steel mill.

Industry standards requires materials to be tested at the manufacturer's and the result to be submitted through a report, also called the Mill Sheet/ Mill Certificate/ or Mill Test Certificate.

A Heat Number is a unique identification code that a technician stamps on a metal plate to provide information about it's origins. 
Heat Number is the only way to trace a metal plate back to it's Mill Sheet, and therefore is a very important part of quality assurance and control.

There may be three/ four or five segments in a Heat Number.

1) The first digit indicates which furnace is used to prepare the batch of molten metal. 

2) The next two digits tells about the year of casting.

3) The next two/ three digits describes the number of casting that year by the furnace. (Batch No.)

4) Heat number can have more segments to provide information about the manufacturer and their facilities. Like the facility number, if the manufacturer has more than one unit, or factories where the metal is casted.

5) It can also tell about the mold number which is used to make the product. This can be useful for matching replacement parts, as people can use the mold number to get an exact replacement.

This whole information corresponds to records that the manufacturer keeps for future references.

In quality control people subject a sample piece of metal from every batch to some testing to make sure it matches the quality standards and meets the required tolerances. 

They will be tested for contaminants, weak spots and other issues. If there is a problem with the metal, people can recall all other pieces of metal with the same Heat Number to check them and see if they share the issue.

The number also corresponds to records about the shift that handled the metal, what time of day it was cast and so forth. This information can be useful when people want to determine why the same quality control problems keeps recurring.

This can also be very useful for activities like Accident Forensics, where investigators may want to find more about a particular metal product to see if a problem with the metal contributed to the accident.

As long as the manufacturer keeps current records, it should be possible to trace and look up any piece of metal back to it's origins just by looking at it's Heat Number.


Comments

Popular posts from this blog

The Intuitive Lowest Cost Method

The Intuitive Lowest Cost Method Or The Minimum Cell Cost Method The Intuitive Lowest Cost Method is a cost based approach to finding an initial solution to a transportation problem. It makes allocations starting with the lowest shipping costs and moving in ascending order to satisfy the demands and supplies of all sources and destinations. This straightforward approach uses the following steps. Identify the cell with the lowest cost. Allocate as many units as possible to that cell without exceeding the supply or demand. Then cross out the row or column or both that is exhausted by the above assignment. Move on to the next lowest cost cell and allocate the remaining units. Repeat the above steps as long as all the demands and supplies are not satisfied.  When we use the Intuitive Approach to the Bengal Plumbing problem, we obtain the solution as below. Transportation Matrix for Bengal Plumbing From \ To Warehouse E Warehouse F Warehou

The Stepping Stone Method

The Stepping Stone Method Once an initial feasible solution to a transportation problem is determined by any of the previous methods, the next step is to solve the model for the optimal solution. The Stepping Stone Method is an iterative technique used to evaluate the cost effectiveness of  the shipping routes not currently in the solution. When applying it, we test each unused cell, or square, in the transportation table by asking : What would happen to the total shipping cost if one unit of product was tentatively shipped to an unused route? To illustrate the same, let us look at the initial solution of the Bengal Plumbing Problem derived by the Northwest Corner Rule. Transportation Matrix for Bengal Plumbing From \ To Warehouse E Warehouse F Warehouse G Factory Capacity Plant A 100 Rs. 5 0 Rs. 4 0 Rs. 3 0 100 Plant B 200 Rs. 8 0 100 Rs. 4 0 Rs. 3 0 300 Plant C Rs. 9 0 100 Rs. 7 0 200 Rs. 5 0 300 Warehous

Vogel's Approximation Method (VAM)

The Vogel's Approximation Method In addition to the North West Corner and Intuitive Lowest Cost Methods for setting an initial solution to transportation problems, we can use another important technique - Vogel's Approximation Method (VAM). Though VAM is not quite as simple as Northwest Corner approach, but it facilitates a very good initial solution, one that is often the optimal solution. Vogel's Approximation Method tackles the problem of finding a good initial solution by taking into account the costs associated with each alternative route, which is something that Northwest Corner Rule did not do. To apply VAM, we must first compute for each row and column the penalty faced if the second best route is selected instead of the least cost route . To illustrate the same, we will look at the Bengal Plumbing transportation problem. Transportation Matrix for Bengal Plumbing From \ To Warehouse E Warehouse F Warehouse G Factory Capacity Plant A